Simple Method Proposal for Cost Estimation from Work Breakdown Structure

Using Learning Objective: LO-2 Create a project charter, a scope statement, a Work Breakdown Structure (WBS), and Responsibility Assignment Matrix (RAM). Research the learning objective on the web. For this paper you will need to summarize and discuss the article in the required paper. Remember to include a link to the article. Write a two page paper, plus the title page and a reference page on the topic

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *