Benefit Values
Benefit Values To complete this discussion: •Conduct research and determine benefits associated with the economic opportunity that you proposed in your Unit 3 assignment. •Assign dollar values to each benefit. ◦Explain how you found or arrived at the assigned dollar values. •Use the preformatted Cost-Benefit Analysis Template spreadsheet, linked in the Resources. Total CNAO cost non-discounted (M EUR) Total CNAO cost discounted (M EUR) Past investment cost, 2002–2013 159.3 188.8 Future investment cost, (including research line) 2014–2031 28.6 23.8 Operating costs (2011–2031) 315.8 248.5 Total 511.7 465.9 Note: Total amount includes decommissioning costs.
Leave a Reply
Want to join the discussion?Feel free to contribute!